Uraloğlu pointed out that the roof restoration of the historical station, which is the first stage where the most damage was experienced, was completed in 3 years in accordance with its original form and gave the following information:
"11 steel roof trusses for the roof building consisting of two towers were remanufactured and restored in accordance with the original. The old steel trusses damaged in the fire, brick walls and roof wood materials were also repaired and taken under protection. Copper, lead and slate roof coverings and roof gutters were renewed in accordance with the original.
Underlining that the interior restoration damaged in the fire was completely built in accordance with the original.Uraloğlu stated that the plaster repair and paint types of the passenger waiting room on the ground floor, which was destroyed by the fire, were carried out in accordance with the original.